restoration works

Télécharger
plan eglise Ploare.pdf
Document Adobe Acrobat 439.2 KB

A restoration programme for the Church was put forward in order to carry out the technical architectral plan (PAT).

The works are financed by the "regional direction of cultural affairs" (DRAC) and by the town Council of Douarnenez.

  • October 2008 : Restoration of the wainstcoting of the aisles (finished in Spring 2010) ;
  • 2012 : South side of the transept, propping up of the cornice of the framework wainstcot cleaning up of the buttress of the north front (between the bays number 13 and 17) ;
  • 2013 : restoration of the bay number 6 ;
  • 2014 : restoration of the bays number 8, 10, 12 ;
  • 2015 : restoration of the bays number 14 and 16 ;
  • 2016 : restoration of the porch and the vestry and laying of a drainage along the south front.

restoration (conditional parts)

Télécharger
RESTAURATION (TRANCHES CONDITIONNELLES 1
Document Adobe Acrobat 32.5 KB

DURING THE WORKS


AFTER THE WORKS



the firms

- Société ART from Plelo Le Grand : masonry, freestone ;

- Sociéte UDOC from Morlaix : roofing, coating with zinc ;

- Société LUMIVITRAIL from Pontivy : stained glass windows ;

- Atelier des Feuillantines from Paris : architecture and patrimony ;

- Cabinet HUET from Paris : Economy of the undertaking.

-